SSI Schaefer Digital Twin Lab

Expose throughput assumptions, density trade-offs, interface behavior and recovery paths before the live warehouse becomes the test environment. Models remain useful only when their inputs, simplifications and acceptance links are visible.

Inspect the input contract
Input data contract

A model is bounded by what it represents

The input contract names source, period, owner, unit and treatment for each dataset. Order history is separated from forecast scenarios. Physical travel distance is separated from nominal crane or shuttle speed. Failure and recovery assumptions are listed beside the responsible control layer.

Missing information is not silently replaced by a favorable default. It is marked as an assumption with a sensitivity test, an owner and a date for confirmation. This makes later design changes traceable instead of turning the model into an unreviewable black box.

Demand

Orders, lines and waves

Timestamped demand, SKU velocity, order size, cutoff logic, cancellations and replenishment.

Physical

Loads and geometry

Rated load, load center, aisle clear width, rack load rating, beam deflection and station envelope.

Behavior

Storage and queue rules

Putaway priority, retrieval batching, blocked destinations, retry limits and manual interventions.

Interfaces

States and timing

WMS, WCS, WES, PLC and material flow controller messages, interface cycle time, confirmations, timeouts and ownership.

Simulation scenarios

Compare storage and flow decisions across a controlled scenario deck

Every reported output carries the scenario identifier, input revision and warm-up or observation period. A result is interpreted inside that boundary rather than promoted as a universal system rate.

Baseline

Representative operating day

Tests normal SKU and order distributions, replenishment, breaks and routine station variability. The baseline checks whether queues and retrieval missions are stable before peak or failure cases are introduced.

Observe
Order lines/hour, system availability %, travel, queue time and buffer occupancy
Peak

Sustained demand window

Raises release demand for the defined duration while retaining realistic downstream capacity. This distinguishes a brief burst from a system that holds stable output throughout the shipping cutoff.

Observe
Buffer occupancy, unserved missions, aisle utilization, backlog
Disturbance

Blocked aisle and reduced capacity

Removes a crane, shuttle lane or transfer point and applies the agreed control response. The run shows whether failure remains isolated and how much time is required to clear accumulated work.

Observe
Graceful degradation, reroute delay, recovery time, manual work
Reproduction path: retain the input snapshot, model build, scenario script, random seed where used, run duration and output definition. Re-run the scenario after any routing, traffic or control-rule change that affects acceptance.
WMS / ERPWork demand and inventory intent
WCS / WESRelease, routing and global coordination
Material flow controllerAisle allocation, sequencing and buffering
PLC / equipmentPhysical state, interlocks and transfer
Controls emulation

Exercise the handshake before the machinery is available

Emulated devices respond to commands, delay confirmations and inject defined faults so interface behavior can be reviewed ahead of site commissioning. The method is useful for message structure and state transitions; it cannot prove physical sensor performance or real load stability.

A documented responsibility matrix identifies which layer detects each condition, which layer decides the next state and who authorizes a restart. Tests cover normal transfer, duplicate message, delayed response, invalid identity, loss of communication and controlled recovery.

  • Environment: versioned software build and interface definition
  • Method: scripted state sequence with expected and observed results
  • Evidence: timestamped message log, issue record and signed disposition
Acceptance traceability

Carry requirements from model to FAT and SAT evidence

A requirement identifier links the operating need, model scenario, interface or physical test, result and open issue. The trace prevents a simulated result from being mistaken for a completed site test.

R-01

Requirement

State the rate, density or response with operating boundary and owner.

S-01

Scenario

Identify the input revision, model build, event set and output definition.

F-01

FAT evidence

Record emulated interfaces, expected states, observed log and deviation status.

A-01

SAT evidence

Repeat applicable checks with installed geometry, real loads and site systems.

Technical trade-offs kept visible

Density versus selectivity

Higher inventory cube utilization may raise clean-run capacity while increasing sequencing debt and recovery blast radius unless fire aisles and pull-outs are designed explicitly. Selectivity and mean time to repair are reported with the reduced-aisle disturbance case, not only the baseline.

Peak rate versus resilience

More buffer occupancy allowance, alternate routing and safe recovery may lower the clean-run maximum while improving stable order lines per hour during disturbance. Divert accuracy and interface cycle time assumptions stay attached to each scenario ID.

Centralized versus modular controls

Emulation can exercise either a centralized WCS/WES or modular PLC adapters. The model states whether OPC UA, fieldbus or proprietary APIs are assumed, and which layer owns functional safety stop authorization at the required performance level (PL).

Fixed automation versus flexible robotics

Deterministic AS/RS modules can be paired with flexible robotic induction or pick cells. The twin must state which SKU velocity bands belong to fixed machinery and which belong to reconfigurable cells so acceptance tests do not blur the two.

Book a twin review

Request a Digital Twin Lab working session

Bring the minimum input contract: demand sample, load geometry, peak window, interface sketch and the acceptance questions the model must answer.