Site Assessment Service Regions Automation roadmap for storage and AS/RS cutover
SSI Schaefer engineering team reviewing storage application plans
Heritage of practical guidance

About SSI Schaefer: making warehouse storage choices easier to discuss

Since a supplied planning baseline of 2010, SSI Schaefer teams have treated pallet racking, dense storage and AS/RS as operating problems first—loads, aisle profiles, interfaces and recovery—before equipment catalogs.

Company story

A timeline built around clearer operating questions

The dates below use generated-range planning values from the brand brief. They are not independently verified public corporate claims and must not be read as certified history. Public references that mention Neunkirchen headquarters should be verified against the current legal entity for your project region.

  1. 2010

    Start with the constraint the warehouse cannot ignore

    Early SSI Schaefer planning conversations asked which pallet families drive the peak, how replenishment competes for aisle time, and what happens when a WCS handshake times out—before recommending a bay count or crane height.

  2. 2012–2018

    Density and selectivity become a shared language

    Projects across roughly 18 countries in the planning brief taught teams to state inventory cube utilization with selectivity, fire aisles and recovery access in the same drawing set—not as afterthoughts.

  3. 2019–2023

    Interfaces and acceptance evidence grow sharper

    As WMS, WCS, PLC and material flow controller ownership became more complex, SSI Schaefer workshops added responsibility matrices, FAT fault sequences and SAT with representative loads to the standard review pack.

  4. Today

    Phased commissioning protects live fulfillment

    With more than 250 people in the planning range and 900+ product SKUs referenced for portfolio breadth, the working habit remains: convert assumptions into witnessed evidence before celebrating installation progress.

Working values

Four habits that keep SSI Schaefer projects honest

Curiosity before capacity

Ask how SKU velocity, order shape and peak duration interact before selecting a headline retrievals-per-hour figure or crane count.

Clarity before commitment

Document WMS, WCS, PLC and equipment ownership while changes are still inexpensive and acceptance criteria can still move.

Recovery before celebration

Test fault handling, safe access and restart paths as seriously as the nominal production run during FAT and SAT.

People around the aisle map

Roles that show up in every serious SSI Schaefer workshop

Warehouse operations director in a planning session

Operations leadership

Owns peak windows, labor content and the degraded modes the site can tolerate during cutover.

Rack structural engineer reviewing load ratings

Rack and structural engineering

Keeps residual capacity, load center and seismic or floor assumptions attached to the same bay drawing as the storage concept.

Controls engineer reviewing WCS interface matrix

Controls and integration

Owns handshake timing, alarm ownership and the evidence path from emulation to FAT and SAT.

Reference frameworks

Review frameworks mentioned in planning conversations

Icons below identify common engineering review frameworks. They do not claim that SSI Schaefer or a specific product model holds a named certificate. Applicability depends on product model, site and contracted scope.

EN 15512 reference FEM guideline reference ISO 12100 reference ISO 13849 reference
Continue the conversation

Bring the operating profile that shapes SSI Schaefer storage scope

Share load units, SKU velocity bands, peak duration, aisle constraints and whether density or direct selectivity is the non-negotiable boundary.

Contact the engineering desk